The only Hann family owned heating, cooling & plumbing business in Cleveland!
BLOG |

The Big Boiler Puzzle

On Display: Teamwork, Muscle, Experience

 

The Boiler Puzzle

     One thing, among many, that  Verne & Ellsworth Hann is good at doing is putting together a puzzle – and taking one apart. In this case, as illustrated in the photo above, we’re taking a puzzle apart. This puzzle in particular is a very, very heavy puzzle, one that is nearly a 3/4 million BTU steam boiler.

     Each one of these eight sections weighs well over 300 pounds and needs to be taken apart by large steel wedges and sledge hammers. The keys to taking this goliath apart is years of experience, working as a synchronized team, and lots of good old fashioned muscle. Let’s keep in mind each one of these cast iron sections needs to be removed delicately enough from a basement in order not to harm any woodwork, flooring or steps. The boiler team his highly aware of all of these facts because most often we find our work in older century homes. These homes typically have crafted woodworking, end-grain oak flooring and irreplaceable sandstone masonry walkways. Great care is taken to protect all of the unique assets of a home.

     Bringing in the new boiler takes even more attention to detail. The new boilers are delivered to the point of installation without a scratch on them. We can turn your old boiler room into a showroom. In fact, it’s not uncommon to for homeowners to proudly show off their new boiler to guests. It is a feat of modern day engineering.

     Once complete, the boiler puzzle will go on to serve your home well, keeping everybody warm and comfortable. It’s a puzzle that you don’t want to do yourself one lazy summer afternoon. Leave it to the professional boiler puzzle masters: Verne & Ellsworth Hann: 216-932-9755.

What People Are Saying

  • Really impressed with the team who performed the install and in particular the quality of work!

    - Thomas T.( Shaker Heights, Furnace & Air Conditioning Installation, December 2018 )
  • Your installers did a great job.  They were timely, very professional, and with quality workmanship.

     

    - Robert S.( Morland Hills, Wall Heater Installation, December 2018 )
  • The installers, Bill and Matt, were very professional.  Everything was done in a timely fashion and just how Bill Hann said it would be.  The unit has been working perfectly.

    - Bernie H.( Cleveland Heights, Boiler Installation, November 2018 )
  • Incredible crew!  Thank you

    - Nicole C.( Shaker Heights, 2 Furnace & 2 Air Conditioner Installation, November 2018 )
  • Thanks so much for a high-quality install and great service!

    - Ryan H.( Shaker Heights, Furnace & Air Conditioning Installation, November 2018 )